• SOUTH EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Execution of earth work in formation between ch. 100 to 5050 (ch. Starts form CSB of Vinaiki) and construction of minor bridge No.2 (66.1X3.5m RCC Box) at ch.1983m ROB no. 4(1×21.0m RCC T beam girder) at Ch. 4002m & two Nos. aqueduct at ch. 3853 & ch.4464 along with other allied and miscellaneous works between ch.100 to 5050 in Vinaiki – Shikara section in connection with Gondia – Jabalpur gauge conversion project. Awarded value of work Rs.163650594/- 2434.45
    2. Execution of earth work in formation between ch. 5050 to 7100 (ch. Starts form CSB of Vinaiki station) and construction of minor bridge aqueducts, siphon along with other allied and miscellaneous works between Vinaiki – Shikara section in connection with Gondia – Jabalpur gauge conversion project. Awarded value of work Rs.82882894/- 1396.08
    3. Execution of all balance civil works to make section fit for commissioning except ballast supply, track linking and building works in between Shikara (Including) – Ghansore(Including) section (approximate 22 Kms) in connection with Gondia – Jabalpur gauge conversion project. Awarded value of work Rs.358648247/- 4213.92
    4. Construciton of pile foundation, Sub-Structure, approaches including allied and miscellaneous works for major bridge no. 182 (2×12.2m + 9×45.7m) between IB and Brijrajnagar stations in connection with construction of JSG-BSP 4th line. 2384.05
  • RAIL VIKAS NIGAM LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Railway track linking, supply, CMS crossing (exeluding supply of Rails, sleepers) including supply of special sleepers, SEJs and supply of ballast etc. for Dallirajhara – Dondi section (17.00km) in connection with a new Rail link between Dallirajhara and Rowghat in Raipur division of South East Central Railway in the state of Chhattisgarh, India. Awarded value of work Rs.244298686.00 2236.57
  • RITES LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Bridge, Buildings, Workshop and associated Electrical works for Railway siding and MGR System of NTPC, Vindhyachal, Stage-IV, (Package-3), Vindhya Nagar, Distt. Singrauli, State: Madhya Pradesh 4516.78
    2. Earthwork in Formation, construction of Bridges, P-way works and other miscellaneous works in connection with balance work of KBJ Rail Line between Krishnashila and Shaktinagar Stations of E.C. Railway of Khadia Project of NCL, Distt.: Sonebhadra (U.P.) 3127.56
    3. Construction of Road over Bridge for Traffic Facility by PWD Dept Raipur (C.G.) in lieu of L-“XING” No. 424-B (Gondwara Gate) between URK-SZK bye pass line at km. 827/28. B (827.918)at Raipur CG 1483.85
  • WEST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Construction of important bridgr at Dhasan river of span 13*30.50 m pre-stressed concret girder and ancillary work in connection with Lalitpur-Khajurahoi new BG rail lime project. 2654.06
    2. Contruction of 3 majour bridges no3 9 (4*18.30), 18 (2*18.3 m) and 19 (18.3+5*30.5) PSC grider/box and ancillay work in connection with PMA-BPL new BG rail line project . 2139.65
    3. Construction of three road over bridges in lieu of leve; crossing no. 82 (Ramganjmandi-Morak) at km 849/14-16, no. 180 (Gangapur city-Choti udai) at Km 1098/8-10 and 252/B (Jaghina-Jajanpatti) at Km 1222/6-8with all ancillary portion work on nagada-mathura section of Kota Devision 1777.49
  • PNC INFRATECH LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Contsruction of four laning works (Structur only) for Ghajiabad-Aligarh section of NH-91 from Km 84.000 to Km 12.0690 & 33.0 KM to 41.0 KM in th state of of Uttar Pradesh (Package no ST-4&5) (Cement and steel supplied by PNC free of cost) 5014.59
    2. Construction of Fly Over at Agra Link Road at Ch. -l+850 Minor Bridge at Ch. 10+400 and other structures including VUPs PUPs, and Box Culverts between Ch. -2+634 arld Ch. 16+000 of Agra Lucknow Expressway of 8 Lanes Under Uttar Pradesh Expressways Industrial Devlopement Authority 5170.94
    3. Devlopment of jaora – Nayagaon Section from Km. 125.000 to Km. 252.00 on SH 31 to 4 lane in the state of Madhya Pradesh -Sub contract works for ROBs in Km. 131 & 156 and other structural works 1263.41
  • INDUSTRIES

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1.a) Devlopment of Mines of prism cement ltd and hiring of dozer at prism cement ltd. at Mankahri Satna (M.P.) 8301
    1.b) Handling of material for Prism cement lt.d , Satna 2690
    2. Extention of private railway siding at Prism cement limited, satna 1195.55
    3. Contruction of Railway siding for Jhajjar Thermal Power project(2*660 MW) at Plant site village-Khanpur, near Jharli railway station, tahsil-Matenhail, Disctt : Jhajjar, Haryana 1437.94
    4. Addtion and alteration of railway siding facility for cement grinding unit at M/S Diamond cements imlai dist. Damoh 727.00
    5. Execution of earthwork in formation, construction of bridges, p-way works in connection of railway siding from Turki road railway station to JRC plant at Jaypee Nagar, Rewa 1550.00
  • SRCP

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Construction of majour bridges, ROB’s and RUB’s for New Bg railway line between surajpur railway station & Rananunagar in south east central railway for sarguja ril corridor project Phase-I in the state of Chattisgarh. (Cement & Steel supplied by SCPL free of cost) 1620.00
  • OTHER INDUSTRIAL PROJECTS AND MISC. WORKS

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Civil construction of Clinker Soli at raibareli (U.P.) the Vice president -Project, Birla Corporation limited, Kolkatta (W.B.) -Cement & Steel supplied by BCL free of cost. 440.00
    2. Civil & Structural works at Maiher cement plant, Maher satna (M.P.) -Cement & steel supplied by BCL free of cost 1147.64