• RITES LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Earthwork in Formation, Constrcution of bridges, P-Way works, Building, Electrical & other miscellaneous work in connection with P.R. siding at Gorbi-Block B Project of NCL Gorbi work. 48.81
    2. Earthwork in Formation, Construction of Bridges, P-Way works, Building works, Road works and other ancillary works in connection with construction of coal transportation system Package for Tanda Thermal Power Project Stage-II (2×660 MW) at Vidyutnagar, Distt.: Ambedkar Nagar, Uttar Pradesh (Package-1) 90.65
    3. Supplying, Laying & Linking of P-way works including Earthwork in Formation, Road diversion works, Shifting of level crossings, Foot over bridges Station Building, Platform, Rail over Rail Flyover, Minor Bridges, Locoshed, Internal and External Electrical Works and other allied Works from Hamirpur Road Station (North Central Railway) (DRAIPL-MBPL JV) 256.84
    4. Earthwork in formation, Constrcution of Minor and Major Bridges and other Miscllaneous works from Ch. Km 0/000 (Etah railway Station) to 8/700 in connection with Construction of Railway siding for JVUNL, Jawaharpur TPP (2X660 MW), District: Etah, State Uttar Pradesh Package-1 69.72
  • RAIL VIKAS NIGAM LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of road bed, major and minor birdges and track linking work (excluding supply of rails and sleepers, thick web switches and special sleepers) in connection with doubling between Mahadeokhedi to Malkhedi on Bhopal and Jabalpur division of WCR in Madhya Pradesh, India 56.00
    2. Construction of ROB’s , Road under bridges and majour bridges for electrified new BG railwa line between mangalia gaon (Indore)- Budhni staion’s (198 Kms) between ratlam & Bhopal division of WCR in the sate of MP. (Package 1)- New Work 304.22
    3. Const. of roadbed, minor bridge, plateform, building, switchyard, fob etc. and electricle work in connection with the doubling of Phaphamau-Jhanghai section on lucknow decision of NCR in the state of Uttar Pradesh. – New Work 207.27
  • PNC INFRATECH LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of Major Bridge , Minor Bridge,VUP,PUP,LVUP and Box culverts between km. 60+000 to km. 76+000 of NH-75/76″ Four laning of Jhansi – Khajuraho section (pkg-1) of from km. 76.3 (existing km. 106.300 of NH-25 Kanpur -Jhansi section to km.82.10) of NH-75/76 in the State of UP/MP” 78.80
    2. Devlopment of Purvanchal Expressway (Package -VI) from Govindpur (Dist. Azamgarh) to Mojrapur (Distt. Azamgarh) (Km. 218+300 to Km. 246+500) in the state of Uttar Pradesh on EPC Mode 120.00
  • WEST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of major /important bridges between Sagoni/ Ratangaon -Katni Murwara [from km 1175/3 to km 1235.35] in connection with 3rd line between Bina-Katni. (GPT-MBPL JV) 65.08
    2. Constn. Of major /important bridges between Golapati-Sagoni/Ratangaon(deom Km 1161 to km 1175/30) in connection with 3rd line between Bina-Katni. 48.77
    3. Proposed construction of foundation and sub structure of important bridge (Sone Bridge span 16×45.7 M) at chainage 80304 M between Churhat and Sidhi stations in connection with Rewa – Sidhi New B.G. Rail Line Project. (Two packet) 64.00
    4. Construction of major and minor bridge, RUB, U type PSC “U” Girder bridge 18.3M, 12.20M Span and 9.15m, 6.1m, 4.75m, 3.66m, 3.05m span PSC Slab and 2.44, 1.83,1.22,0.915, 0.61 m Span Pre cast RCC Slap ( All RDSO Drawings) at Bridge 984/1, 1197/2,1199/2,1204/1 and for other bridges and Ancillary work in connection with Bina-Katni 3rd line project. 10.75
  • EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Earthwork in Embankment compaction, blanketing turfing construction of Minor Bridge major bridge Km. 26.123) RUBs FOBs and other associated works from Ch. 24.4 Km. to 32.405 (Excludining Tunnel in connection with construction of new BG rail line from koderma to Tilaiya under jurisdiction of Dy. CE/C/DHN (MBPL-KLD JV) 90.99
    2. Supply Stacking & Spreading of Stone Ballast, Linking of P-Way including Transportation of P-Way material like rail sleeper fittings etc. and other associated work as per railway specification and standared between Obra Km. 138.900 (Excluding Yard) in connection with doubling between Ramna and Singrauli under Dhnbad Division (MBPL-KLD JV) 18.76
    3. Supply, Stacking and Spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway specification and standard between km 15.400 to Shaktinagar (Including Yard) in connection with doubling between Karaila Road and Shaktinagar under Dhanbad Division of ECR 18.55
  • SOUTH EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of foundation, substructure, approached, protection work and other miscellaneous work including design for bridge no. 86 (1×12.2 m + 9×30.5m +1×12.2m) with pile foundation at km 609/23-610/13 Br.no. 71 (1×18.3m + 1×12.2m) at km 624/23-25, Br. no. 69 (4×18.3m) at km 633/3-7, Br. no. 66 (4×12.2m) Br. no. 59 (4×12.2m) at km 642/1-3, Br. No. 54 (5×18.3m) at km 654/19-21 between Bhupdeopur-Saragaon Station, in connection with Bilaspur-Jharsuguda 4th line project. 62.51
  • CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Track work in section -III (kms. 145.00 to 216.00) in connection with Pune -Miraj Doubling project. (NRK-MBPL-JDB JV) 68.08
  • NORTH CENRTAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Constn. Of major bridges (16 Nos. & Earthwork in approaches, including protection and other ancillary works in Lalitpur-Jhansi Section (89.91 Kms) in connection with Bina-Jhansi 3rd lime Project (Zone-B) : (GPT-MBPL JV) 127.89
  • SOUTH EASTERN RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of Foot Over Bridge and other Allied Works at Sonakhan Yard, Sogra Yard & at the Yard between Dhutra to Sonakhan station including Metallizing works of FOB & Other steel structure works between Rourkela to Dhutra station in connection of 3rd Line Work between Rourkela to Dhutra station in connection of 3rd Line Work between Rourkela – Jharsuguda under the Jurisdiction of Dy. Chief Engineer (Con-I), Rourkela of S.E. Railway. 25.63