• RITES LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Proposed construction of ROB for traffic facility by PWD raipur in lie of L-Xing no. 424B (Gondwara Gate) between URK-SZB bye pass line at Km. 827/28B-30B (at Raipur C.G.) 2560.36
    2. Earthwork in Formation, Construction of Bridges, P-Way works, Building works, Road works and other ancillary works in connection with construction of coal transportation system Package for Tanda  Thermal Power Project Stage-II (2×660 MW) at Vidyutnagar, Distt.: Ambedkar Nagar, Uttar Pradesh (Package-1) 9064.97
    3. Construction of 4 Nos Major Bridge for rivers/Nalas and 09 Nos of RCC Box bridges for praposal railway siding from Ch. 00 to Ch. 37.15 km (Between  Nimarkheri Station and NTPC Entry gate) for proposed Railway siding for NTPC khargone STPP (2X660MW) Package VII. 6682.96
  • RAIL VIKAS NIGAM LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Balance works for cinstruction of roadbed, major and minor bridges, track linking (Excluding supply of rails, ordinary track , sleepers and thick web switches) outdoor signalling and electrcile (general) works in connection with doublng of Akalkot road-Gulbarga section( 78 kms) of Hogi-Gulbarga section in solapur division of centra railway in the state of Maharashtra & Karnataka, India 7859.23
    2. Construction of road bed, major and minor birdges and track linking work (excluding supply of rails and sleepers, thick web switches and special sleepers) in connection with doubling between Mahadeokhedi to Malkhedi on Bhopal and Jabalpur division of WCR in Madhya Pradesh, India 4286.60
  • PNC INFRATECH LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Sub-contract for contrction of major & minor structure/bridges and ROB’s between km. 150-200 of Aligadh Moradabad road project of PNC 4500
    2. Construction of Major Bridge , Minor Bridge,VUP,PUP,LVUP and Box culverts between km. 60+000 to km. 76+000 of NH-75/76″ Four laning of Jhansi – Khajuraho section (pkg-1) of from km. 76.3 (existing km. 106.300 of NH-25 Kanpur -jhansi section to km.82.10) of NH-75/76 in the State of UP/MP” 7880
    3. Devlopment of Purvanchal Expressway (Package -VI) from Govindpur (Dist. Azamgarh) to Mojrapur (Distt. Azamgarh) (Km. 218+300 to Km. 246+500) in the state of Uttar Pradesh on EPC Mode 12000
    4. Four laning of Jhansi -Khajuraho Section (Pkg-2) from km 76.3 to Km 161.7 of NH -75/76 in the states of MP and UP under NHDP Phase III on Hybrid Annuity Mode 1098
  • WEST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Construction of major /important bridges between Sagoni/ Ratangaon -Katni Murwara [from km 1175/3 to km 1235.35] in connection with 3rd line between Bina-Katni. (GPT-MBPL JV) 6507.87
    2. Constn. Of major /important bridges between Golapati-Sagoni/Ratangaon(deom Km 1161 to km 1175/30) in connection with 3rd line between Bina-Katni. 4876.77
    3. Proposed construction of foundation and sub structure of important bridge (Sone Bridge span 16×45.7 M) at chainage 80304 M between Churhat and Sidhi stations in connection with Rewa – Sidhi New B.G. Rail Line Project. (Two packet) 4287
    4. Construction of major and minor bridge, RUB, U type PSC “U” Girder bridge 18.3M, 12.20M Span and 9.15m, 6.1m, 4.75m, 3.66m, 3.05m span PSC Slab and 2.44, 1.83,1.22,0.915,
    0.61 m Span Pre cast RCC Slap ( All RDSO Drawings) at Bridge 984/1, 1197/2,1199/2,1204/1 and for other bridges and Ancillary work in connection with Bina-Katni 3rd line project.
    1075
  • EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Earthwork in Embankment compaction, blanketing turfing construction of Minor Bridge major bridge Km. 26.123) RUBs FOBs and other associated works from Ch. 24.4 Km. to 32.405 (Excludining Tunnel in connection with construction of new BG rail line from koderma to Tilaiya under jurisdiction of Dy. CE/C/DHN 9098.78
    2. Supply Stacking & Spreading of Stone Ballast, Linking of P-Way including Transportation of P-Way material like rail sleeper fittings etc. and other associated work as per railway specification and standared between Obra Km. 138.900 (Excluding Yard) in connection with doubling between Ramna and Singrauli under Dhnbad Division 1876.39
  • CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Track work in section -III (kms. 145.00 to 216.00) in connection with Pune -Miraj Doubling project. 6807.83
  • NORTH CENRTAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Constn. Of major bridges (16 Nos. & Earthwork in approaches, including protection and other ancillary works in Lalitpur-Jhansi Section (89.91 Kms) in connection with Bina-Jhansi 3rd lime Projec t (Zone-B) : (GPT-MBPL JV) 12788.53