• RITES LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Earthwork in Formation, Constrcution of bridges, P-Way works, Building, Electrical & other miscellaneous work in connection with P.R. siding at Gorbi-Block B Project of NCL Gorbi work. 4881
    2. Supplying, Laying & Linking of P-way works including Earthwork in Formation, Road diversion works, Shifting of level crossings, Foot over bridges Station Building, Platform, Rail over Rail Flyover, Minor Bridges, Locoshed, Internal and External Electrical Works and other allied Works from Hamirpur Road Station (North Central Railway) (DRAIPL-MBPL JV) 25683.91
    3. Earthwork in formation, Constrcution of Minor and Major Bridges and other Miscllaneous works from Ch. Km 0/000 (Etah railway Station) to 8/700 in connection with Construction of Railway siding for JVUNL, Jawaharpur TPP (2X660 MW), District: Etah, State Uttar Pradesh Package-1 6972.03
    4. Earthwork in Formation, Construction of Bridges, P-Way works, Building works, Road works and other ancillary works in connection with construction of coal transportation system Package for Tanda Thermal Power Project Stage-II (2×660 MW) at Vidyutnagar, Distt.: Ambedkar Nagar, Uttar Pradesh (Package-1) 9064.97
  • RAIL VIKAS NIGAM LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Balance works for cinstruction of roadbed, major and minor bridges, track linking (Excluding supply of rails, ordinary track , sleepers and thick web switches) outdoor signalling and electrcile (general) works in connection with doublng of Akalkot road-Gulbarga section( 78 kms) of Hogi-Gulbarga section in solapur division of centra railway in the state of Maharashtra & Karnataka, India 7859.23
    2. Construction of road bed, major and minor birdges and track linking work (excluding supply of rails and sleepers, thick web switches and special sleepers) in connection with doubling between Mahadeokhedi to Malkhedi on Bhopal and Jabalpur division of WCR in Madhya Pradesh, India 4286.60
  • PNC INFRATECH LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Construction of Major Bridge , Minor Bridge,VUP,PUP,LVUP and Box culverts between km. 60+000 to km. 76+000 of NH-75/76″ Four laning of Jhansi – Khajuraho section (pkg-1) of from km. 76.3 (existing km. 106.300 of NH-25 Kanpur -jhansi section to km.82.10) of NH-75/76 in the State of UP/MP” 7880
    2. Devlopment of Purvanchal Expressway (Package -VI) from Govindpur (Dist. Azamgarh) to Mojrapur (Distt. Azamgarh) (Km. 218+300 to Km. 246+500) in the state of Uttar Pradesh on EPC Mode 12000
    3. Four laning of Jhansi -Khajuraho Section (Pkg-2) from km 76.3 to Km 161.7 of NH -75/76 in the states of MP and UP under NHDP Phase III on Hybrid Annuity Mode 1098
  • WEST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Construction of major /important bridges between Sagoni/ Ratangaon -Katni Murwara [from km 1175/3 to km 1235.35] in connection with 3rd line between Bina-Katni. (GPT-MBPL JV) 6507.87
    2. Constn. Of major /important bridges between Golapati-Sagoni/Ratangaon(deom Km 1161 to km 1175/30) in connection with 3rd line between Bina-Katni. 4876.77
    3. Proposed construction of foundation and sub structure of important bridge (Sone Bridge span 16×45.7 M) at chainage 80304 M between Churhat and Sidhi stations in connection with Rewa – Sidhi New B.G. Rail Line Project. (Two packet) 4287
    4. Construction of major and minor bridge, RUB, U type PSC “U” Girder bridge 18.3M, 12.20M Span and 9.15m, 6.1m, 4.75m, 3.66m, 3.05m span PSC Slab and 2.44, 1.83,1.22,0.915,
    0.61 m Span Pre cast RCC Slap ( All RDSO Drawings) at Bridge 984/1, 1197/2,1199/2,1204/1 and for other bridges and Ancillary work in connection with Bina-Katni 3rd line project.
    1075
  • EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Supply, Stacking and Spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway specification and standard between km 15.400 to Shaktinagar (Including Yard) in connection with doubling between Karaila Road and Shaktinagar under Dhanbad Division of ECR 1855.1
    2. Supply Stacking & Spreading of Stone Ballast, Linking of P-Way including Transportation of P-Way material like rail sleeper fittings etc. and other associated work as per railway specification and standared between Obra Km. 138.900 (Excluding Yard) in connection with doubling between Ramna and Singrauli under Dhnbad Division 1876.39
  • SOUTH EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Construction of foundation, substructure, approached, protection work and other miscellaneous work including design for brisge no. 86 (1×12.2 m + 9×30.5m +1×12.2m) with pile foundation at km 609/23-610/13 Br.no. 71 (1×18.3m + 1×12.2m) at km 624/23-25, Br. no. 69 (4×18.3m) at km 633/3-7, Br. no. 66 (4×12.2m) Br. no. 59 (4×12.2m) at km 642/1-3, Br. No. 54 (5×18.3m) at km 654/19-21 between Bhupdeopur-Saragaon Station, in connection with Bilaspur-Jharsuguda 4th line project. 6251.18
  • CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Track work in section -III (kms. 145.00 to 216.00) in connection with Pune -Miraj Doubling project. 6807.83
  • NORTH CENRTAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN LACS)
    1. Constn. Of major bridges (16 Nos. & Earthwork in approaches, including protection and other ancillary works in Lalitpur-Jhansi Section (89.91 Kms) in connection with Bina-Jhansi 3rd lime Projec t (Zone-B) : (GPT-MBPL JV) 12788.53